Blog

Projects / Case Studies
An 8m × 4m Hydro One® prefabricated pool being lifted towards its Level 4 installation location by tower crane at D'IMMERSIONE Mont Kiara.
The Above-Ground Installation of a Hydro One® Swimming Pool at D’IMMERSIONE, Mont Kiara
An 8m × 4m prefabricated Hydro One® pool had to travel from factory floor to a Level 4 facilities deck - within a tight tower-crane installation window.